Type of Award: SBIR Phase III, IDIQ, CPFF, Level of Effort (LOE)/Delivery Order (DO) Contract Number: FA8650-04-D-2409 Lead-In Phase II: F33615-99-C-2911 Awards: DO 001: Security of Large Scale Systems I, PI: E. A. Walters, Period: 2/24/04 to 5/8/06 DO 002: Research in Advanced Power Systems, PI: E. A. Walters, Period: 9/27/04 to 1/26/06 DO 003: Security of Large Scale Systems II, PI: E. A. Walters DO 004: Research in Advanced Integrated Aircraft Systems, PI: E. A. Walters and T. Baudendistel, Period; 5/11/06 to 6/10/11 DO 005: Multi-Level Heterogeneous Modeling, PI: E. A. Walters, Period: 7/13/06 to 10/12/09 DO 006: Evaluation of Advanced Integrated Systems I, PI: E. A. Walters and J. R. Wells DO 007: Bi-Directional Power Architectures for More Electric Aircraft, PI: J. R. Wells, Period: 1/31/07 to 10/15/09 TO 008: Propulsion and Power Integration, PI: E. A. Walters and J. R. Wells, Period: 12/21/06 to 1/15/09 TO 009: Virtual System Integration Laboratory (VSIL), PI: E. A. Walters and J. R. Wells, Period: 10/4/07 to 10/5/09 TO 010: Arc Fault Modeling of an H-60 Generator, PI: B. P. Loop, Period: 7/2/08 to 3/2/09 TO 011: Evaluation of Advanced Integrated Systems II, PI: J. R. Wells, Period: 10/11/08 to 1/10/11 TO 012: Integrated Vehicle & Energy Technology (INVENT) Subsystems Development and Demonstration (SDD), PI: E. A. Walters, Period: 2/17/09 to 6/23/11 Total Funding to Subcontractors: Purdue, Wright State, Lockheed Martin, Northrop Grumman, Radiant, and Rolls-Royce Agencies: U.S. Air Force Research Laboratory Status: On Going Period: 2/24/04 to 2/24/14 Principal Investigator: E. A. Walters Brief Description and Purpose:...
Read More